| Posted By |
|
|
|
| |
 |
Orient, Ohio Posts: 82
Joined: Jan, 2004
| offline |
|
|
|
| | |
|
Schaumburg, IL Posts: 50
Joined: Oct, 2003
| offline |
|
"Palm Tech" report time
[#2] Posted: 04/25/2004 - 6:00:40 PM |  | |
|
Hi David,
For those of us who prepare reports at home, it's going to take at the very minimum 4.5 hours. You've got the inspection, travel time and report writing. A good comment/narrative library helps.
Erol Kartal
|
Erol Kartal ProInspect |
| |
|
|
| | |
|
Pahrump, NV Posts: 84
Joined: Feb, 2005
| offline |
|
"Palm Tech" report time
[#3] Posted: 03/20/2005 - 09:49:10 AM |  | |
|
Why are you not doing the report on your PDA during the Inspection and then download to your computer at home. This should cut down your report time.
|
Monte Lunde CCI, CCPM, CRI VCSI www.vikingconstructionservices.com |
| |
|
|
| |
 |
Orient, Ohio Posts: 82
Joined: Jan, 2004
| offline |
|
"Palm Tech" report time
[#4] Posted: 03/20/2005 - 5:14:03 PM |  | |
|
Monte, Lately I've been using the Jornida to imput information as I go. It does cut down on the inspection time and should reduce it further as I get better at typing as I walk.
I have a problem with the screen in sunlight. My associate is trying the smaller PDA which is better outside. But I like the larger size and was wondering if the newer model simular in size to the Jornida would be worth considering.
|
| David A. Inspecting Columbus, Ohio |
| |
|
| |
|
|
|
|
|
|
|