Entire perimeter of house/garage showed concrete spillage from original pour, apparently having exuded under edge forms. It not only negates positive slope at its beginning, it looks unsightly.

Where the building sewer exits there is a deep cavity under the edge that looks due to simple fill settlement.

I think the only way to assess the length and depth of the cavity is to expose it by digging, but is it feasible to try breaking off the overspill all around?

Click to Enlarge
tn_2016112911928_PB280021.jpg

55.37 KB

Link to comment
Share on other sites

I was careful to suggest cutting away the sloppy. Because this subdivision was built at the edge of the big building collapse I was told many houses stood empty for most of a year. The cavity at the drain exit might even be an abandoned armadillo hole. They have been moving into our area for a number of years.

Link to comment
Share on other sites

Backfill is not an option if the 6 in clearance from grade to siding is met. On other sides of the building backfill was added that reduced that clearance to about 4 in., but the concrete "shelf" remains. All the builder had to do was make his form a little taller/deeper. It is the worst looking slab pour I have ever seen as far as those edges go.

A better solution might be to backfill up to the level of the 'shelf'. There'll still be enough foundation exposed.

Marc

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...