Jump to content

Search the Community

Showing results for tags 'delta corner grounded'.

  • Search By Tags

    Type tags separated by commas.
  • Search By Author

Content Type


Forums

  • Technical Forums
    • Exteriors Forum
    • Landscaping & Site Drainage Forum
    • Roof Forum
    • Plumbing Forum
    • Electrical Forum
    • HVAC Forum
    • Attics & Insulation
    • Foundation Systems Forum
    • Fireplaces, Chimneys & Wood Burning Appliances
    • Interiors & Appliances
    • Swimming Pools and Spas
    • Building Science
    • Green Technologies
    • Pest Control (WDI, WDO and Rodents)
    • Environmental Hazards
    • Indoor Air Quality (I.A.Q.) and Mold Forum
    • Tools & Equipment
    • InfraredThermography
    • Report Writing and the Written Word
    • Computers & Reporting Systems Forum
    • Free Downloads and Online Training Resources
  • Business Forums
    • Marketing Techniques
    • Insurance Questions
    • Bare Bones Biz Money Making Q & A
    • 203(k) Consultants & FHA Inspectors
    • Help Wanted - Businesses For Sale
    • For Sale or Swap
  • H.I. Associations, Training, and Licensing Issues
    • Professional Home Inspection Associations
    • Home Inspection Licensing and Pending/Legislation
  • Miscellaneous Discussion Forums
    • Open Discussion Forum (Chit-Chat)
    • Open Topics
    • Architectural Nightmares and Remuddles
    • Inspecting/Appreciating Old Homes
    • International Home Inspector Issues
    • Feedback For TIJ
    • Help Using TIJ Forums
  • TIJ's News You Can Use
    • News Around The Net
    • Inspector Rants!
    • Safety Alerts/Health Advisories
    • The Latest Reviews For Home Inspectors
    • Product Recalls
    • Site Announcements
  • Make Your Publication Submissions Here
  • Home Inspector Polls
    • Professional Practices Polls

Blogs

  • The Latest News For Home Inspectors
  • Getting A Reliable Concrete Agitator Truck Available For Sale
  • Choosing The Right Concrete Pumping Equipment
  • Finding the Optimum Egg Tray Machine in India
  • Should You Consider Buying An Egg Carton Making Machine?
  • Guide For Selecting Egg Tray Machine Manufacturers
  • An Egg Tray Making Machine On The Market
  • A Paper Egg Tray Making Machine In Kazakhstan
  • Exactly Why Do Countless Users Choose A 40-Ton Overhead Crane?
  • The Impressive Great Things About A 20-Ton Gantry Crane
  • Reasons To Purchase The Pulp Molding Machine

Categories

  • Air Conditioning Systems
  • Appliances
  • Building Science
  • Drainage & Landscaping
  • Electrical Systems
  • Exteriors
  • Foundations
  • Garages & Carports
  • Heat Pumps
  • Heating Systems
  • Historical Structures
  • Inspecting...
  • Installation Guides
  • Insulation
  • Interiors
  • Pests & Rot
  • Plumbing
  • Porches, Decks & Balconies
  • Professional Practices
  • Reports
  • Roofs
  • Software
  • Structure
  • Ventilation Systems
  • Indoor Air Quality & Mold

Find results in...

Find results that contain...


Date Created

  • Start

    End


Last Updated

  • Start

    End


Filter by number of...

Joined

  • Start

    End


Group


About


Location


Website


Occupation


FACEBOOK


TWITTER


SKYPE


YOUTUBE


GOOGLEPLUS

Found 1 result

  1. Yesterday, I needed help. I was on a roof of a small commercial building and inspected the HVAC equipment. It was all 208-230v three phase stuff typical for smallish commercial spaces. There was a (full of yellow jackets) Fed Pac, three phase disconnect on the equipment. In the basement, there were three single phase 100 amp disconnects that served panels in the building, and one service panel all fed from a gutter. There was one single-phase disconnect fed from another source with a back-fed 100 amp breaker, two, 2-pole 20-amp breakers and a 2-pole 60 amp breaker. The 60 amp breaker was identified as the breaker for the HVAC equipment. My head started hurting. I then noticed that all the *neutral* wires had been re-identified with black tape. I metered L1 to L2 and got 240v. Then I metered L1 to ground and L2 to ground and each produced 240 v. I called Douglas Hansen; his caller ID must not work and he answered. After I explained the situation, he identified the system as corner grounded three phase. I've read about the configuration- I believe that the breakers used must be rated @ 240v or higher (not 120/240), they must also be rated for 3 phase. §240.85 Is there anything else I should discuss? Clearly, the panel in question is a complete do-over- I see the stuff wrong in this panel, but if I run into another one of these things what should be discussed? Since folks won't be able to resist- the panel and breakers are water damaged, breakers in use not rated for the panel, HVAC breaker should be 50 amps, not 60 and no hold-down kit on the back-fed main. Douglas- thank you for your help, I sincerely appreciate you taking the time to answer my call.
×
×
  • Create New...