Jump to content

What the heck does he think


Phillip

Recommended Posts

that it is installed right.

I wrote up the lack of a kick out at the roof to wall connection.

It was not repaired on the first re-inspection.

This is what it looked like on the second re-inspection.

The builder says it is installed right and is going to put it in a letter that it is correct along with his name and builder license number.

I still will be writing it up as WRONG.

Click to Enlarge
tn_201194203522_Picture%20006.jpg

67.19 KB

Link to comment
Share on other sites

Wow! I include this picture if I recommend kickout flashing. I don't think I've ever seen it installed right. Most of the time its field manufactured which in most cases is wrong too.

Click to Enlarge
tn_201194215028_kickout-diagram-fw.jpg

35.93 KB

I sent the page from the VSI with the kickout on it when I did the last re-inspection

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...