two main panels


John Dirks Jr
 Share

Recommended Posts

In todays inspection there were two main panels. Each had their own SEC that came from the meter. Each had their neutrals and grounds bonded.

Since they each have their own entrance cable, is it ok to consider them as independent, and there not be a problem with both being bonded?

Image Insert:

200872418481_HPIM2464.jpg

83.33 KB