Jump to content

Vinyl Siding


Bryant16e

Recommended Posts

From the VSI installation manual....

Eaves Treatment

The last course of siding may be cut to fi t the eaves opening

(Fig. 47).

Measure from the soffit to the base of the upper lock on

the previous course of panels. Subtract 1/4’’ (6.4mm).

Mark this dimension on the panel to be cut, measuring

from the bottom edge of the panel. It is a good idea to

check the dimension in several locations along the length

of the wall.

Using a snap lock punch, punch the vinyl siding along the

cut edge every 6â€

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...