I currently work in the industry. With a clean water loss, it won't be a problem to dry things given the right conditions and they know what they're doing. Often the pad is removed, but with the right pad and extraction equipment, it can be saved. As long as the drywall gets dry, ideally within 3 days it sould be fine. The IICRC sets the standards for the industry.