Jump to content

NorthFLAC

Members
  • Posts

    3
  • Joined

  • Last visited

Personal Information

  • Location
    USA
  • Occupation

NorthFLAC's Achievements

Starting Member

Starting Member (1/5)

0

Reputation

  1. Stock submittals are bare bone for the most part, but I will take a look, thanks. As far as getting the pad to the ground we usually use Red Heads, or epoxy.
  2. We arent worried about HOW to do this, we already know how to do it, we just need to show the local building department a drawing on how it is mounted. They just need a decent drawing to show for hurricane standards. We are going to the pad route as well. The manufacturer has been slow to answer my questions, and the inspector is asking faster than the manufacturer is answering.
  3. I've been asked to provide a drawing showing how my company is going to mount a condenser to the ground for a job. I cannot find this drawing for the life of me, or even how to go about getting it. We will be mounting a Bally BEHA010E6 condensing unit to the ground. I have the drawings for the unit itself, but not how we are going to screw that sucker into the ground. If anyone can help, at least point in the right direction, that would be great.
×
×
  • Create New...