Jump to content

thekctermite

Members
  • Posts

    2
  • Joined

  • Last visited

Everything posted by thekctermite

  1. The bonding and grounding/earthing should occur at the point of service, which is the main service disconnect. The interior panel is a subpanel in this case, and the neutrals should be floated and there should not be any bonding. Bonding at a subpanel presents a hazard and is never acceptable.
  2. Those jelly jar lights must not be getting it done.
×
×
  • Create New...